Archive for the ‘Combodia’ Category
Project For countryside village in Cambodia Set a Pouring Water Machine
The big waterway was build beside village’s rice field by government. But waterway is far from rice field more than 4m height. They can’t use waterway’s water for height distant. Than, they can’t product rice in dry season because no water.
We will offer pouring machine for them, and they can make rice in dry season. This project can promote villages rice product.
Condition for project: Management by village, Make development model, Equity condition
Pouring Water Machine
1 Contract to villagers
The obligation of villagers when use machine
• They have to pay money 5000 Riel (1$ 25sent) for management foundation that want to use machine.
• They have to pay money for fuel each 1 hour (Price is depend on fuel cost)
• They have to fix machine from management foundation. (IRFF didn’t have obligation)
• The manager have obligation to note how many people use machine and how long time use. They have to show note when IRFF staff demand.
• If community leader (manager) cannot manage for sickness or something accident, he has to choice argent.
They keep machine on community leader’s house when didn’t use machine.
2 Machine’s properties
Code Name: Unnamed (because this machine is second used)
A motor made in Japan Fuel tank & pump made in China
Tyres and frame made in Cambodia
Cost : 1380$ (Include Hose, Pipe, battery etc everything detail parts)
Date : 17-September 2006
Shop : [LAO SRENG]
No24 Eo.street67 Sangkat Phsar Thmey, Khan Daun Penh
Tel 012 853 032 (Front of Central market west)
Guarantee: 2 years (Only fix service. Cannot change motor)
Machine properties
• Power of bring water = 285 /hour · Horizontal range = 18m
• Height range = 5.5 m · Rotary rate = 1450r/min
• Power = 22 k w · Fuel = Diesel
This machine builds by Japanese old motor and Chinese old pump. Frame and tyres made by Cambodia .Look like “Hand made”.
But the power is strong. It has 22kw. (Kind of this machine have only 17 k w generally)
3 Machine Test
September 17 2006 , we had test to use this machine actually after bought.
(In our contract, we didn’t pay until test)
![]() |
![]() |
![]() |
![]() |



